The Seawater Culvert Bridge Project was a significant civil infrastructure project focused on enhancing the safety and durability of the existing road system. The project works included road saw cuts followed by the excavation of the road to prepare the site for the new bridge structure. Head stop footings were installed, followed by additional excavation for the installation of concrete aprons, with 40 MPa concrete. The meticulous attention to detail of the foundational elements ensured that the bridge was both robust and resilient, capable of withstanding the harsh environmental conditions in the area.
Upon completion of groundwork, we utilised a 40-tonne crane to install the steel module bridge, followed by installation of top guard rails, croc guard rails, and W barriers, further enhancing the safety of the structure. The Seawater Culvert Bridge Project was completed with a focus on quality and durability, providing a reliable and long-lasting solution for the community’s transportation needs.
© Copyright
DJC Build
Licensed Building Practitioners 246190CR (NT)
1203802 (QLD)
Website by Simple Pages